General guidelines
Note
This document serves as a guide to assist with the assembly of the Component Kits. Please note that it does not constitute a traditional assembly manual.
Safety notice
Seek professional assistance if necessary to avoid dangerous situations and injuries.
Power supply
Turn off the power to the robotic system before proceeding with the following steps. Once all steps have been completed, you can safely turn the electrical power back on.
Assembly parts
| Nr. | Quanatity | Description |
|---|---|---|
| 1 | 1 | SCHUNK application kit MTB DG-JGP-P 80-1 consisting of - Double gripper MTB DG-JGP-P 80-1 - Blow-off nozzle |
| 2 | 1 | SCHUNK robot connection package MTB CNK-SG/DG-RF1 consisting of - Gripper adapter plate with 4x M6x10 - Signal cable - Compressed air hose 6mm |
| 3 | 2 | SCHUNK Finger Blanks MTB AUB-JGP-P 80/25 consisting of: - Two finger blanks - 4x Fitted sleeve - 4x Screw M4x 16 |
| 4 | 1 | ISO9409 flange |
| 5 | 2 | Cylinder screw DIN 7984, M6x16 |
| 6 | 1 | Centering pin DIN 7, M6 |
| 7 | 1 | Spiral hose |
| 8 | 6 | Cable tie base + Cable tie 6 mm |

Required tools
- Hex key 2,5 mm, 5 mm, 8 mm
- Wrench 10 mm
Procedure:
Step 1: Attaching the adapter plate to the robot flange (Only for Horst 600, 900, 1000, 1400)
In the first step, attach the ISO 9404 flange to the robot flange.
Start by inserting the DIN 7 M6 centering pin into the corresponding hole in the robot flange. Then, position the ISO 9404 flange in the correct orientation over the centering pin on the robot flange. Make sure that both surfaces on the flange and the adapter piece are free from any dirt or debris. Secure the flange in place using the M6x16 cylinder screws.

Step 2: Mounting the adapter plate from the MTB CNK-SG/DG-RF1 connection package
Next, proceed by mounting the gripper adapter plate from the connection package onto the ISO 9409 flange. Align the robot flange so that the pin hole faces upward for the correct orientation. Then, secure the gripper adapter plate in place using the provided M6 screws.

Pre-assembly of finger blanks and blow-off nozzle
Next, the included blow-off nozzle is mounted on the double gripper MTB DG-JGP-P 80-1. To do this, unscrew the plug and use a 10mm wrench to mount the blow-off nozzle. |
| |
Next, mount the finger blanks on the gripper jaws. To do this, center the finger blanks on the gripper jaws using the included fitted sleeves and secure them in place with the provided M4x16 screws. |
| |
Mounting the double gripper on the robot
Now, attach the pre-assembled double gripper to the robot flange. Align the gripper over the two pressed-in alignment pins on the gripper adapter plate and then secure it in place using the integrated connecting screw on the gripper (Tool: 8mm hex key).

Next, screw in the signal cable and insert the compressed air hose.

Attaching the external energy chain
The external energy chain is guided along the robot arm using the cable tie bases. These bases are mounted on the robot using the housing screws. Refer to the illustration for the correct position and orientation.

Next, wrap the signal and compressed air hoses with a spiral hose, ensuring a length of 2 meters.

Finally, secure the external energy chain using cable ties on the cable tie bases.
Make sure to leave enough space between the loops of the energy chain to allow the individual axes to maintain the required range of motion for the application.

Connection to CONTROL
The signal cable can be connected to the robot's control system as follows:
| CONTROL Terminal | Cable color Signal cable | Function |
|---|---|---|
| X11.3 24V | brown | 24 VDC0 |
| X14.1 GND | blue | GND |
| X1.1 DI01 | white | Sensor gripper 1, position A |
| X1.2 DI02 | green | Sensor gripper 1, position B |
| X1.3 DI03 | pink | Sensor gripper 2, position A |
| X1.4 DI04 | yellow | Sensor gripper 2, position B |
| X9.1 DO01 | black | Teach function, sensor gripper 1 |
| X9.2 DO02 | gray | Teach function, sensor gripper 2 |
| X9.3 DO03 | red | Switching gripper 1 |
| X9.4 DP05 | violet | Switching gripper 2 |
| X9.5 DO06 | gray pink | Enabling signal |
| X9.6 DO07 | red blue | Switching the blow-off nozzle |